Packaged-engineering approach makes it possible to deliver and install fog systems with a typical project lead time of 12 weeks. Fog systems can be installed on existing turbines with as little as 24 hours of outage time. Fog cooling can improve the output of existing plants.
Mee Industries, (800) 732-5364