Oy Combi Cool AB in Finland received the 2.5 millionth product manufactured and sold by Bitzer as the German compressor manufacturer reached a noteworthy production milestone.

Bitzer handed over the Ecostar condensing unit from its LHVE Series along with a certificate to representatives from the Finnish company, who traveled to the facility in Schkeuditz for the special occasion. Bitzer founded the site in Schkeuditz immediately after the fall of the Berlin Wall in 1991. Since the site was opened, the production volume has increase sevenfold, and the production area expanded from 26,910 ft2 (2,500 m2) to more than 204,500 ft2 (19,000 m2).