A cold-storage facility in Houston, Texas, under construction by Performance Team, a Maersk Co., is designed to handle frozen and fresh commodities.

Scheduled to open in August 2022, the facility include a 90’ loading dock that is temperature-controlled and protected from the elements. The site enables Performance Team to stage a greater number of loads in preparation for domestic or international distribution. The company also worked closely with the USDA on the design to ease the demands placed on USDA inspectors who are facing increased cargo volumes.